BREEZE ( BULK CARRIER)
Steel Works
• Installation of a new system <> on board (ERMA).
• The installation was done in the engine room area on the STBD. This work included the construction and installation of new galvanized pipes, connections to the existing ballast network of the ship.
• Installation of all auxiliary machinery for operation of the system works for MACGREGOR.
• Restoring damage to forward PORT side.