BLUE STAR NAXOS ( Ro/Ro PASSENGER)
Steel Works
• Repair of damage to the bottom of the ship.
• Replacement of plates and floors on the bottom at a height of 700 m from stern to No. 2 forward tank.
• After the end of the work, a welding inspection with penetrating liquids (D-CHECK) was carried out.
• The repair was carried out at the No1 floating dock in shipbuilding and repair zone of Perama.