





OCEAN JAZZ ‘’ HEAVY LOAD CARRIER’’
Steel Works
• Two (2) bow thrusters have been dismantled in the middle and STBD of the ship.
Construction of the bottom bow at side (bilge) and middle of the bottom STBD by steel (GRADE A).
• Both the ship and the prefabricated sections of the Bottom part have been transferred to Chalcis Shipyards in order for the fitting to be done, in a floating dock.
