





ALOUETTE II ( MEGA YACHT )
Steel Works
• Repairing damage to the bottom of the ship from Stern to Bow.
• Placing pillars all over the bottom of the ship to avoid distortions due to hot work and checking with an alignment machine daily.
• The bottom plates that were replaced were AH-36 steel material.
• The repair was carried out at the Papila Shipyards in Perama.
