



PIANO LAND (PASSENGER SHIP)
Steel Works
• Removal of old letters and signals of the ship's name on the forward PORT and STBD sides. Additional removal of the letters on the stern of the ship and on the Funnel
• Construction and installation (with electric welding) of embossed letters from steel GRADE A, using ground lifting cranes.
