Athina ( MEGA YACHT )

Steel Works

• Bow replacement (fore peak).
• Replacement of bottom plates aft from engine room to stern tube.
• Placing pillars all over the bottom of the ship to avoid distortions due to hot work and checking with an alignment machine daily.
• The bottom plates that were replaced were steel GRADE A material.
• The repair was carried out at the Atlas Shipyards in Perama.