






BLUE STAR PATMOS ( Ro/Ro PASSENGER )
Steel Works
• Repair of damage to the bottom of the ship.
• Replacement of plates and floors on the bottom from stern to ball bows bow.
• Placing pillars all over the bottom of the ship to avoid distortions due to hot work and checking with an alignment machine daily.
• The bottom plates that were replaced were steel GRADE A material.
• The repair was carried out on the floating Dock No. 2 at the Elefsis Shipyards ( is a Greek shipbuilding company) .
